
Boatman’s House
A redevelopment scheme of an existing 50,000sqft waterside office building to provide change of use to 108 residential dwellings across 53,000sqft. Located in East London, Boatman’s House is situated close to the waterside in the emerging Isle of Dogs and South Polar OAPF.
What we did
Pell Frischmann’s Fire Engineering Team has been commissioned to provide fire strategy and fire safety engineering advice and support on the:
- Removal of the existing ACM cladding and proposal of a non-combustible solution with appropriate cavity fire barriers;
- Addition of two occupied floor-storey levels to the top of the building;
- Sprinkler protection to be installed throughout all apartments;
- Structural fire resistance study with acceptable ventilation requirements to reduce the structural fire resistance to the existing 90 mins rating;
- Include an additional protected escape stair to supplement the fire-fighting stair, to allow alternative egress and justify the extended travel distances between the fire-fighting lift and fire-fighting stair;
- Open-plan flat arrangements to a large number or apartments.
Key Details
Location:
London, UK
Client:
Chassey + Last
Partners:
HG Construction Ltd
Year:
2021
Sector:
Specialism
Pell Frischmann’s Leading Fire Safety Engineer Keanne Danby said:
“The building, as an existing office space, has existing design and construction constraints to be overcome, along with the recent government reforms in Regulation and Amendment as well as the Fire Safety Bill, has provided opportunity for a fire engineered solution to be implemented. This is an exciting development, which we have added cost savings and value engineering to both the client and the end-user.“


