Allahabad Bypass Project, India

SectorSector: Bridges

CostCost: £ 12,400,000

ClientClient: National Highways agency of India

locationLocation: Ganga River, India

project DetailsProject Details

Divided into two sections; a 85km road and a bridge over 1km in length across the river Ganga. The bridge is composed of two parallel bridges, and is constructed with precast segmental cantilever construction technology with epoxy-glued joints and internal bonded pre-stressing.